top of page
Chart on the digital tablet screen.

DELIVERABLES

The following deliverables are related to the LEAPS-INNOV project:

Month 1-18 (Reporting Period 1)

No.
Title
Due date
Status
D1.1
Kick-off meeting report
May 2021
submitted
D3.1
Report on Open Market Consultation
Jun 2021
submitted
D10.1
POPD - Requirement No. 1
Jun 2021
submitted
D1.2
Innovation Advisory Board ToR
Sep 2021
submitted
D2.1
Conceptual Design Report for the germanium detector prototype system
Sep 2021
submitted
D1.3
Report on Annual Meeting
Mar 2022
submitted
D5.1
Collated existing solutions and future requirements of facilities for beamline synchronisation
Mar 2022
submitted
D6.1
Summary report on design of the short period high field prototypes
Mar 2022
submitted
D6.2
Summary report on design of advanced EPU prototypes
Mar 2022
submitted
D6.3
Summary documentation of the two measurement bench prototypes
Mar 2022
submitted
D7.1
Evaluation report on data rates and volumes and assessment of future needs of LEAPS facilities
Mar 2022
submitted
D4.1
Design report of prototype gratings
Sep 2022
submitted
D7.2
Report on metrics for data reduction and compression
Sep 2022
submitted
D9.1
Co-Creation inventory / catalogue
Sep 2022
submitted

Month 19-36 (Reporting Period 2)

No.
Title
Due date
Status
D2.2
Multi-channel integrated preamplifiers qualification
Nov 2022
.
D1.4
Report on Annual Meeting in month 24
Mar 2023
.
D3.2
Universal data format specification for surface topography description
Mar 2023
.
D4.2
Midterm report on EBL process: test sample realisation and fabrication path of full-sized prototype gratings
Mar 2023
.
D6.6
Midterm report on WP6 meets industry
Mar 2023
.
D8.1
Report on IPR training
Mar 2023
.
D8.2
Midterm report on industry innovation activities and services provided to SMEs
Mar 2023
.
D9.2
Midterm report on LEAPS-INNOV co-creation actions
Mar 2023
.
D4.3
Report on metrology
Sep 2023
.
D5.2
Validation report on the design model of interferometry systems for online metrology
Sep 2023
.
D5.3
Definition of a standard protocol for synchronisation between beamline components
Sep 2023
.
D2.3
Preliminary qualification of the assembled detector head
Dec 2023
.
D7.3
Report results on promising data reduction pipelines on datasets provided by LEAPS facilities and release as open-source to the community
Dec 2023
.
D7.4
Best practices and guidelines for applying data reduction and compression at LEAPS facilities
Feb 2024
.
D1.5
Report on Annual Meeting in month 36
Mar 2024
.
D5.4
Definition of  Europe-wide standard for microfluidic chips for sample handling
Mar 2024
.

Month 37-48 (Reporting Period 3)

No.
Title
Due date
Status
D4.4
Prototype gratings
Jul 2024
.
D5.5
Validation of the performance of the magnetic levitation stage demonstrator
Sep 2024
.
D6.4
Summary report on performance of the short period high field prototypes
Sep 2024
.
D6.5
Summary report on performance of the advanced EPU prototypes
Sep 2024
.
D3.3
Report on performance of candidate metrology techniques supporting manufacturing process of freeform optics
Nov 2024
.
D4.5
Report on grating characterisation
Nov 2024
.
D5.6
Integration of microfluidic chip with the contactless sample manipulation system
Nov 2024
.
D1.7
Recommendations of RI-INNOV Coordination Group
Jan 2025
.
D2.4
Detector prototype performances tests report
Jan 2025
.
D6.7
Report on WP6 KT and TT best practise
Jan 2025
.
D8.3
Report on outreach to European countries without LEAPS facilities
Jan 2025
.
D8.4
Industry engagement in the context of instrumentation: worked case study booklet
Jan 2025
.
D9.3
Recommendations to strengthen the LEAPS co-creation process
Jan 2025
.
D3.4
Prototype mirrors with < 50 nrad rms slope errors
Feb 2025
.
D4.6
Workshop on NeXtgrating technology
Feb 2025
.
D5.7
Installation of the synchronisation protocol and demonstrator experiment at several facilities
Feb 2025
.
D8.5
Final report on industry innovation activities and services provided to SMEs
Feb 2025
.
D1.6
Report on Annual Meeting in month 48
Mar 2025
.
D2.5
Evaluated production plan
Mar 2025
.
D3.5
Systematic study of performance of different deterministic processing methods for X-ray reflective freeform optics
Mar 2025
.
D5.8
Report on qualification of the metrology demonstrators
Mar 2025
.
D8.6
Industry survey results & draft of long-term  industry engagement strategy for LEAPS
Mar 2025
.
D9.4
Co-creation science instrument pilots result and recommendations
Mar 2025
.
bottom of page